pedeSTRAIL with drainage kerbstone

FACTS

  • Location: Railway station Nuth, Netherlands
  • Line: Schinnen – Heerlen, stop Nuth
  • Client: Bouwplaats de Wilde Spoorbouw
  • Products: pedeSTRAIL with drainage erbstone
  • Length: 4,5 meters
  • Conditions: UIC54 / NS90
  • Period: August 2021

 

ADVANTAGES Drainage kerbstone

  • Identical in design with T-kerb with an integrated drainage system.
  • The surface water of the road is kept away from the level crossing and can seep into the ground.
  • Quick installation in combination with standard foundations from STRAIL.

 

AT A GLANCE

At the railway station in Nuth, located in the hilly and rainy province of Limburg, well-functioning drainage has always been an important issue. That is why the STRAIL drainage kerbstone was added to the pedeSTRAIL system, which is used very frequently in the Netherlands. The D-kerbstone could be added to the existing drainage system without any problems.

With the pedeSTRAIL level crossing system and the STRAIL drainage kerbstone, a safe, barrier-free and dry crossing of the tracks in Nuth is now possible.

pedeSTRAIL mit D-Bord Anschluss

Picture 1: The drainage kerbstone is easy to connect to the existing drainage system.

pedeSTRAIL mit D-Bord fertig

Picture 2: The drainage kerbstone can be combined with all STRAIL level crossings.

Übergang mit pedeSTRAIL und D-Bord in Nuth

Picture 3: The drainage kerbstone keeps the surface water of the road away from the level crossing, so it can seep into the ground.