FACTS

  • Location Tecuci North, Faurei-Tecuci Km 239 + 226
  • Client BAWI Construction SRL
  • Products pontiSTRAIL 713 + STRAIL 1,200 mm
  • Conditions UIC60E1, T00 Sleepers, Skl 14
  • Length/Quantity 2x times 13.20 running metres of track
  • Period 2 days, incl. track and road renewal

 

AT A GLANCE

On the Faurei-Tecuci railway line, there are two level crossings directly behind each other in the area of the TECUCI Nord stop.

This area represented a critical crossing between the national road in Tecuci and the crossing railway line. It was therefore decided that together with the renewal of the tracks, the two level crossings should also be modernised.

Due to the high traffic volume and the local conditions – crossing angle 70°, cant 35 mm – it was decided to install pontiSTRAIL 713 outer panels and STRAIL inner panels.

The installation as well as the track and road renewal was carried out within two days with a total closure of the road and the suspension of railway operations.