Renewing of Railway track in Australia

FACTS

  • Client: Roy Hill Project
  • Location: Samsung Construction Group / Subcontractor: John Holland Group Australia, new line from Roy Hill to Port Hedland
  • Products: STRAIL
  • Length/Quantity: 80 level crossings, totally 1,000 running meter
  • Period: May – December 2014

 

ADVANTAGES

  • Endures even heavy loads for a long time but is nevertheless fast and easy to install.
  • Using this material reduces noise substantially.
  • Special surface guarantees excellent skid resistance.

 

AT A GLANCE

The new railway line (344 km), which connecting the iron ore mine „Roy Hill“ with the harbour of Port Hedland (Western Australia) was finished in 2014.

On this railway line are heavily loaded crossings with traffic of road trains with a total weight of up to 150 t.

Added to this are extreme environmental conditions such as high UV radiation, high temperatures, sand, heavy loads and high speeds.

Therefore the client decided to use our STRAIL level crossing system.

Picture 1: Extreme load by heavy goods vehicle traffic.

Picture 2: STRAIL level crossing.