Installation of turnout sleeper – Hanságliget

 

FACTS

  • Location: Container – and Kombiterminal | Fényeslitke, Magyarország
  • Client: East-West Intermodális Logisztikai Szolgáltató Zrt.
  • Products: STRAILway turnout sleeper
  • Length/Quantity: 118 pcs / 434 m
  • Conditions: Rail 60E2 | Track gauge 1435 mm with axle load 22.5 t |
  • Track: gauge 1450 mm with axle load 25.0 t
  • Period: July 2021

 

ADVANTAGES

  • Very good machinability with standard woodworking machines.
  • Environmentally friendly.
  • Life span > 50 years.

 

AT A GLANCE

As part of the new Silk Road, the the container and intermodal terminal, a greenfield investment of the of the East-West Intermodális Logisztikai Szolgáltató Zrt. in Fényeslitke in 2021 will be built.

This track network connects East and West, standard gauge and broad gauge. 6.2 km of broad-gauge, 5.2 km of standard-gauge and 28 broad-gauge as well as seven standard-gauge points were installed.

The standard-gauge and broad-gauge tracks cross each other on two crossings built with STRAILway sleepers. This large network makes it possible goods trains can shunt within the terminals.

The terminal is operated with green energy and with the most modern 5G network.

Of course, STRAILway, the green and modern plastic sleeper, fits in particularly well with these new modern technologies.

Installation with commercially available woodworking machines

Checking the track gauge 1,520 mm

Crossing standard gauge and broad gauge

Finished superstructure